We participated in the construction of the entire Škofja Loka bypass as a subcontractor of
Gorenjska gradbena družba d.d..Measurements were made in all segments of construction of
ROADS, TUNNELS and BRIDGES.
The construction included:
• the route of the new 3,932-metre long bypass
•
predor a 712-metre tunnel
• a 492-metre rescue shaft
•
5 bridges (4 to 8 metres high) with a total length of 245 metres
• 2 underpasses with a total length of 45 metres
• 2 pedestrian underpasses with a total length of 55 metres
• 4 intersections
• supporting structures with a total length of 488 metres
• regulation of watercourses for a length of 488 metres
• anti-noise measures for a length of 552 metres
• detours and arrangements of roads and routes for a length of 3,895 metres
• setting out of all associated service lines (sewage, water, gas, telephone, public lighting, etc.)
Our work included the setting out of all the above-mentioned roads and facilities, real-time measurement of excavations,
displacements, and outlining of billing profiles. After the construction was completed
a geodetic planfor the new layout of the land was made that formed the basis for the design of the executed works. At the request of the investor, we have entered the newly built infrastructure into the
COLLECTIVE CADASTRE OF PUBLIC INFRASTRUCTURE.
The project was successfully completed in September 2015.